<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Our Work Archives - ZPOWER</title>
	<atom:link href="https://z-power.com/portfolio_group/our-work/feed/" rel="self" type="application/rss+xml" />
	<link>https://z-power.com/portfolio_group/our-work/</link>
	<description>A Leading System Integrator for Power, Control and System Solutions.</description>
	<lastBuildDate>Wed, 14 Aug 2024 03:07:14 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://z-power.com/wp-content/uploads/2024/07/zpa-logo-120x120.png</url>
	<title>Our Work Archives - ZPOWER</title>
	<link>https://z-power.com/portfolio_group/our-work/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>KEPPEL DC SINGAPORE 7</title>
		<link>https://z-power.com/portfolio/keppel/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Wed, 20 May 2020 12:11:54 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=3057</guid>

					<description><![CDATA[<p>It is a seven-storey, purpose-built, carrier-neutral colocation data centre for leading internet enterprise and IT services Featuring approximately 185,463 sq ft of Gross Floor Area, SGP 7 is situated in&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/keppel/">KEPPEL DC SINGAPORE 7</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>It is a seven-storey, purpose-built, carrier-neutral colocation data centre for leading internet enterprise and IT services Featuring approximately 185,463 sq ft of Gross Floor Area, SGP 7 is situated in Genting Lane which offers excellent connectivity to key network infrastructure.</p>



<p> In recognition of Keppel’s sustainability focus, KDC SGP7 has been awarded the BCA-IMDA Green Mark (Platinum) Award for New Data Centres, which recognizes its energy-efficient design and operations. </p>



<p>ZPA supported in design, manufacture, supply, install and testing for all heating, ventilation &amp; Air conditioning control systems for DC.</p>



<p>Location: Singapore<br>Completion: 2024<br></p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/keppel/">KEPPEL DC SINGAPORE 7</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>AFTON CHEMICAL MANUFACTURING FACILITY</title>
		<link>https://z-power.com/portfolio/afton/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Wed, 20 May 2020 12:00:25 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=3056</guid>

					<description><![CDATA[<p>The new Plant on Jurong Island will produce components that are key ingredients used in Afton Chemical Corporation’s engine oil additives. ZPA provided design, manufactured, install and test Motor Control&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/afton/">AFTON CHEMICAL MANUFACTURING FACILITY</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>The new Plant on Jurong Island will produce components that are key ingredients used in Afton Chemical Corporation’s engine oil additives. </p>



<p>ZPA provided design, manufactured, install and test Motor Control Centre (MCC ) (IEC 61439-1) fully withdrawable type enclosure with IAC Fault Containment (IEC 61641)</p>



<p>Location: Singapore</p>



<p>Completion: 2020</p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/afton/">AFTON CHEMICAL MANUFACTURING FACILITY</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>PFIZER API FACILITY EXTENSION (TUAS 2)</title>
		<link>https://z-power.com/portfolio/pfizer/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Wed, 20 May 2020 11:57:37 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=3055</guid>

					<description><![CDATA[<p>Pfizer Tuas 2 is a 38,873-square-meter (429,000-square-foot) facility on 8.5 hectares, Veolia design, build, operate and maintain multi-process wastewater treatment plants at Pfizer Tuas 2. ZPA led the design, manufacturing,&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/pfizer/">PFIZER API FACILITY EXTENSION (TUAS 2)</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Pfizer Tuas 2 is a 38,873-square-meter (429,000-square-foot) facility on 8.5 hectares, Veolia design, build, operate and maintain multi-process wastewater treatment plants at Pfizer Tuas 2.</p>



<p>ZPA led the design, manufacturing, Supply, FAT, Testing &amp; Commissioning for the Main Switchboard (IEC 61439-1) fully withdrawable type enclosure with IAC Fault Containment (IEC 61641) and Distribution Boards and Local Control panels.</p>



<p>Location: Tuas, Singapore</p>



<p>Completion: 2022</p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/pfizer/">PFIZER API FACILITY EXTENSION (TUAS 2)</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>NORTH-SOUTH TRANSMISSION CABLE TUNNEL (NS2), (NS3)</title>
		<link>https://z-power.com/portfolio/cable-tunnel/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Wed, 20 May 2020 11:31:40 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=3054</guid>

					<description><![CDATA[<p>NS2 Project forms the central contract of the North-South Transmission Cable Tunnel running from Mandai Shaft to Ang Mo Kio Shaft. The works in this Contract comprise the construction of&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/cable-tunnel/">NORTH-SOUTH TRANSMISSION CABLE TUNNEL (NS2), (NS3)</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>NS2 Project forms the central contract of the North-South Transmission Cable Tunnel running from Mandai Shaft to Ang Mo Kio Shaft. The works in this Contract comprise the construction of a 5.35km tunnel with an internal diameter of 6m. Three circular shafts will be provided as part of the works, Mandai Shaft, Tagore Shaft and Ang Mo Kio Shaft. NS3 project extends from May Road, where the east-west section meets the north-south section part of Singapore. </p>



<p>ZPA provided design, manufactured, install and test 49 units of Tunnel Drives Panels (0.55KW to 132 KW) for NS2 and 71 units of Tunnel Drives Panels (0.55KW to 132 KW) for NS3.</p>



<p>Location: Singapore</p>



<p>Completion: 2019</p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/cable-tunnel/">NORTH-SOUTH TRANSMISSION CABLE TUNNEL (NS2), (NS3)</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>PCS JURONG ISLAND COMPLEX</title>
		<link>https://z-power.com/portfolio/pcs/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Mon, 18 May 2020 10:31:31 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=2761</guid>

					<description><![CDATA[<p>PCS is the centre company of the S$5.4 billion Singapore Essential Chemicals Complex on Jurong Island, the premier hub of Singapore’s energy and chemicals park. Our operations are fully integrated&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/pcs/">PCS JURONG ISLAND COMPLEX</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>PCS is the centre company of the S$5.4 billion Singapore Essential Chemicals Complex on Jurong Island, the premier hub of Singapore’s energy and chemicals park. Our operations are fully integrated with the pipeline-customers and leverages on Jurong Island’s excellent infrastructure and facilities. Coupled with Singapore’s strategic location in Southeast Asia, supportive government policies and availability of skilled manpower, PCS is in a prime location for a world-class&nbsp;essential chemicals complex.</p>



<p>ZPA provided design, manufactured, installed, test and commission MCC with 557 units of fully withdrawable starter modules.</p>



<p>Location: Singapore</p>



<p>Completion: 2023</p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/pcs/">PCS JURONG ISLAND COMPLEX</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>YGT HYDROMOVER</title>
		<link>https://z-power.com/portfolio/ygt-hydromover/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Mon, 18 May 2020 10:29:53 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=2759</guid>

					<description><![CDATA[<p>YGT HYDROMOVER First all-electric battery swapping vessel in the Port of Singapore. It will be most economical and environmentally friendly option for cargo vessel crafts. Reducing fuel costs by approximately&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/ygt-hydromover/">YGT HYDROMOVER</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>YGT HYDROMOVER First all-electric battery swapping vessel in the Port of Singapore. It will be most economical and environmentally friendly option for cargo vessel crafts. Reducing fuel costs by approximately 77% and saving approximately 752 tons of green house gas emissions (GHG) from the atmosphere. It will be the first to use Shift’s PwrSwäp technology, the first pay-as-you-go energy subscription-service that provides instant clean, renewable energy to ships without risk or obligations. </p>



<p>ZPA provide total power systems includes design, manufactured Aluminium light weight MainMain DC Switchboards Grid Converter, AC Group Starter Panels, 230Vac Normal Distribution Board, 24VDC Emergency Distribution Board,Shore Supply Connection Box.</p>



<p>Location: Singapore</p>



<p>Marine Classification: RINA</p>



<p>Completion: 2023<div><font color="#1a1918" face="AtlasGrotesk, -apple-system, BlinkMacSystemFont, Segoe UI, Roboto, Oxygen, Ubuntu, Cantarell, Open Sans, Helvetica Neue, sans-serif" size="1"><br></font></div></p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/ygt-hydromover/">YGT HYDROMOVER</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>70M-ANCHOR HANDLING TUG SUPPLY (AHTS) VESSELS-RAWABI 73, 74, 75, 76, 77, 78, 79</title>
		<link>https://z-power.com/portfolio/70m-anchor/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Mon, 18 May 2020 10:16:57 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=2757</guid>

					<description><![CDATA[<p>Rawabi 73, 74, 75, 76, 77, 78 and 79 is 70M AHTS vessels designed by Focal Marine &#38; Offshore, our client Vallianz Offshore Marine. ZPA led the fast delivery to&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/70m-anchor/">70M-ANCHOR HANDLING TUG SUPPLY (AHTS) VESSELS-RAWABI 73, 74, 75, 76, 77, 78, 79</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Rawabi 73, 74, 75, 76, 77, 78 and 79 is 70M AHTS vessels designed by Focal Marine &amp; Offshore, our client Vallianz Offshore Marine. <br><br>ZPA led the fast delivery to design, manufacturing, Supply, FAT, Testing &amp; Commissioning for the Main Switchboard, Emergency Switchboard, Group Starters Panels, VFD panels, Transformers, distribution panels and Control panels.</p>



<p>Location: Singapore </p>



<p>Marine Classification: ABS</p>



<p>Completion: 2024</p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/70m-anchor/">70M-ANCHOR HANDLING TUG SUPPLY (AHTS) VESSELS-RAWABI 73, 74, 75, 76, 77, 78, 79</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MSC MESSINA</title>
		<link>https://z-power.com/portfolio/msc-messina/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Mon, 18 May 2020 08:43:17 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=2739</guid>

					<description><![CDATA[<p>MSC Messina is a Liberian-flagged container ship. The ship is operated by Mediterranean Shipping Company which is the second largest container operator in the world. It was built in 1995.&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/msc-messina/">MSC MESSINA</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>MSC Messina is a Liberian-flagged container ship. The ship is operated by Mediterranean Shipping Company which is the second largest container operator in the world. It was built in 1995.</p>



<p>Libera-flagged box ship MSC Messina suffered fire damage off the coast of Sri Lanka has arrived in Singapore for repairs, according to the country’s Maritime and Port Authority (MPA)The 4,743-TEU ship suffered a fire outbreak in the engine room on 25 June 2021 in the Bay of Bengal, while MSC Messinawas en-route from Colombo, Sri Lanka to Singapore. </p>



<p>The fire was put out and the vessel was towed to Singapore for repairs and cargo operations, arriving in Singapore last week (6 July) to discharge containers, and is now in an unnamed shipyard for repairs. </p>



<p>ZPA led the fast delivery to replace entire damaged power system in design, manufacturing, Supply, FAT, Testing &amp; Commissioning for the Main Switchboard(IEC 61439-1), Group Starters Panels, Transformers, Busducts, Bow Thruster Panels, distribution panels. and Control panels.</p>



<p>Location: Singapore</p>



<p>Marine Classification: BV</p>



<p>Completion: 2022</p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/msc-messina/">MSC MESSINA</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>PING YUN5000DWT OIL AND CHEMICAL TANKER</title>
		<link>https://z-power.com/portfolio/ping-yun5000/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Mon, 18 May 2020 08:42:10 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=2737</guid>

					<description><![CDATA[<p>Singapore-based ASL Shipyard successfully delivered a product tanker designed by FKAB.Ping Yun is a 5500 M3/5000 DWT product oil and IMO 2 chemical tanker, with a total length 100mand 12&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/ping-yun5000/">PING YUN5000DWT OIL AND CHEMICAL TANKER</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Singapore-based ASL Shipyard successfully delivered a product tanker designed by FKAB.Ping Yun is a 5500 M3/5000 DWT product oil and IMO 2 chemical tanker, with a total length 100mand 12 phenolic epoxy coated cargo tanks. Each cargo tank installed with an electric motor driven deep well pump. </p>



<p>The patent F-Bow hull form ensures good performance in waves and calm water. A bow thruster and a high-lift rudder, together with CPP propeller and integrated propeller boss/rudder bulb design, all makes the vessel with excellent manoeuvrability as well as propulsion efficiency. Frequency controlled shaft generator is installed to further reduce fuel consumption at sea. </p>



<p>ZPA provides design, manufacture, supply Main Switchboards, Emergency Switch boards, Distribution Boards, Transformers, Liquid VFD, Starter, Alarm Monitoring Systems, Consoles.</p>



<p>Location: Singapore</p>



<p>Marine Classification:CR</p>



<p>Completion: 2023</p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/ping-yun5000/">PING YUN5000DWT OIL AND CHEMICAL TANKER</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>BAROSSA FPSO</title>
		<link>https://z-power.com/portfolio/barossa-fpso/</link>
		
		<dc:creator><![CDATA[Above1 Support]]></dc:creator>
		<pubDate>Mon, 18 May 2020 08:39:14 +0000</pubDate>
				<guid isPermaLink="false">https://z-power.com/?post_type=cpt_portfolio&#038;p=2735</guid>

					<description><![CDATA[<p>The Barossa FPSO was developed with subsea production wells, in-field facilities and a gas export pipeline that supplies gas to Darwin LNG. Supply of plates for offshore industry. ZPA led&#8230;</p>
<p>The post <a href="https://z-power.com/portfolio/barossa-fpso/">BAROSSA FPSO</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>The Barossa FPSO was developed with subsea production wells, in-field facilities and a gas export pipeline that supplies gas to Darwin LNG. Supply of plates for offshore industry. </p>



<p>ZPA led the fast delivery to in-design, manufacturing, Supply, FAT, Testing Commissioning for the Distribution Boards(IEC 61439-1)at top side.</p>



<p>Location: Singapore</p>



<p>Marine Classification: DNV</p>



<p>Completion: 2022</p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://z-power.com/contact/">contact us</a></div>
</div>
<p>The post <a href="https://z-power.com/portfolio/barossa-fpso/">BAROSSA FPSO</a> appeared first on <a href="https://z-power.com">ZPOWER</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
